duke manufacturing manual

THIS APPLIANCE SHALL BE CONNECTED TO A GAS SUPPLY IN THE RANGE OF: Gas supply pressure must be checked prior to installation. There are several actions that could trigger this block including submitting a certain word or phrase, a SQL command or malformed data. We and our partners use cookies to Store and/or access information on a device. The exterior of the unit is free of smudges or soil. When the recipe temperature is reached the preheat icon will clear and the well will be ready for use. The installation must conform with local codes, or in the absence of local codes, with the National Fuel Gas Code, ANSI Z223.1/NFPA 54, or the Natural Gas and Propane Installation Code, CSA B149.1 as applicable, including: The appliance and its individual shutoff valve must be disconnected from the gas supply piping system during any pressure testing of that system at test pressures in excess of psi (3.5 kPa). I consent the use of my personal data for marketing purposes. Network Config can be set to Read Only mode if the access is locked within the Tools menu. Improper installation, adjustment, alteration, service or maintenance can cause property damage, injury or death. The top readings should be taken on either side of the rail halfway back on the heat sink. s.r.o. Each fault will display an indicator that is unique for the top of the fault that has appeared. Details below. 0000070047 00000 n Duke RFHU-32-4 ReadyFlex 4 Inch Deep Hot Holding Cabinet Instruction Manual. 0000000016 00000 n Remove cardboard from the corners (4 places). This website is using a security service to protect itself from online attacks. Remove (2) screws per leg and raise/lower to threaded holes. Find a wide variety of genuine elements, switches, motors and more that fit and function with your specific unit. RUNTIME SCREENAfter the RFHU has loaded the runtime screen will load. Control Systems. However, it is sometimes necessary to further test or adjust the broiler once it has been installed. The ReadyFlex has built-in WiFi, Ethernet and Bluetooth connectivity. Home Duke Duke RFHU-22 Hot Holding Cabinet User Guide. They are strapped down on heavy wooden skids and surrounded by heavy "tri-wall" cartons to prevent shipping damage. 3, latest edition) available from the Canadian Standards Association, 5060 Spectrum Way, Mississauga, Ontario, Canada L4W 5N6. See: National Electrical Code, ANSI/NFPA70. This will display the Duke Logo along with the firmware version number of the RFHU. Your local gas supplier should consult the National Fuel Gas Code for proper sizing and installation of gas piping. endstream endobj 1508 0 obj <> endobj 1509 0 obj <>stream CPS Ohio is a certified Duke Manufacturing parts and service provider that serves commercial kitchen and restaurant owners throughout the Midwest. WR(:Qre?~O~tGc?~o7o7/+a(2pgyxW|q>|u f Daypart switching is simple and pre-programmed.ReadyFlex Technology is ready to connect when (and if) you are. 1)Using a utility knife, cut away plastic wrap (Not shown). 0000125876 00000 n When installing the broiler with casters and quickdisconnect hose, adequate means must be provided to limit the movement of the broiler without depending on the connector and the quick disconnect device or its associated piping to limit the broiler movement. The Duke ReadyFlex Hot Holding Cabinet line can be flexible even in terms of dimensions and capacity of the units. The allowable range of good temperatures which can be programmed on the RHFU) is 140F-280F (60C-137.8C). Qualified installation personnel must be familiar with all precautions required and have complied with all requirements of state and local authorities having jurisdiction. Programming the Control . D-1.0 Entering Program Mode .. D-2.0 Navigating the Programming Screens.. D-3.0 Level 1 Programming. D-3.1 Product Identifier.. D-3.2 Cook Temperature.. D-3.3 Cooking Profile . D-3.4 Exit Program Mode . D-4.0 Level 2 Programming. D-4.1 F or C Parameter . D-4.2 Change the Idle Temperature D-4.3 Additional Factory Parameters . D-4.4 Exit Program Mode . E. Troubleshooting . IV. 0000019943 00000 n Status LEDs: Indicates status of the pan. Do not store or use gasoline or other flammable vapors or liquids in the vicinity of this or any other appliance. This will allow the temperature to stabilize and will prevent false readings. Your email address will not be published. Cook Light This light is lit during preheat and the entire cook. Use supplied extension tool to remove and reinstall nuts. through Duke Authorized Parts & Service Distributors throughout the United States. This Service Manual is not all encompassing. 5)Remove cardboard on the ends (2 places). 0000083136 00000 n This information will be saved and readily available if a USB file is required to be created.The RFHU Configurator is available for good programming.As the unit is not connected the RFHU configuration, for example, 22, and 24 will not be automaticallydetected. 0000086233 00000 n Duke Manufacturing OEM Parts and Manuals (Pg 2) - CPS Ohio CAUTION Electrical shock hazard. Fill out the form below and a CPS professional will respond. Four wide units require 2 readings, left and right side. Wiring diagram VII. These are sorted alphabetically. To cancel an unexpired timer you must press and hold. You can search for the part ortech manualyou need looking up the part number, manufacturer, and specific model. Alternatively, if Network is unlocked in the Access menu then changes can be made to the selected network.The RFHU supports both WiFi and Ethernet connections. 1494 68 Our extensive Duke Manufacturing OEM parts inventory is readily accessible online. We ship all in-stock items same day until 9 PM ET Monday-Friday and all online air . Copyright 2023 Duke Manufacturing. 0000089469 00000 n Remove stand and safely raise/lower broiler. Show all Duke Commercial Food Equipment manuals. NetworkThe Network Config option will allow the RFHU network connection to be configured. This broiler should not be installed on a curb base or sealed to the wall. 0000038171 00000 n When well reaches temp the icon will clear and well is ready. A means for restraining may be attached to the vertical portion of the base frame in the rear of the broiler. Hot Holding | Duke Manufacturing 0 0000001694 00000 n Look over the shipping container, carefully noting any exterior damage on the delivery receipt, which must also be signed by the driver/ delivery person. The pan is held in place by four screws on the bottom of the unit. Wiring diagrams are located in the control compartment area of the broiler. Either condition can restrict the flow of air to the combustion compartment or prevent proper ventilation of the unit. Over longer periods of time, the fried food products can accumulate and bake onto the upper heat sink surfaces of the compartments. The All Day option can be used when the well holds the exact same recipe for the entire day.To program a well select the dropdown boxes next to each MENU. The ReadyFlex Holding Unit can then be added to the account using its serial number and API key which can be found on the unit itself.After logging onto the DCEP all connected devices within the account will be displayed. When the well countdown timer expires, the LED will flash RED and an alarm will sound. When the recipe temperature is reached the preheat icon will clear and the well will be ready for use. We are a contract manufacturer for aerospace, power generation, land, marine and medical industries. No pans should be in wells during the preheat and temperature check. This is a great product to bundle with Duke holding units. Download Multi-Satellite Antenna Manual[PDF] , Your email address will not be published. Repeat for all heat sinks. To stop, release the enter key. If this is the case the RFHU recipe and programming settings can be modified on the actual unit UI or alternatively the RFHU Offline Configurator menu option can be used on the DCEP.This can be found under the Recipe menu on the side menu of the DCEP. 0000128627 00000 n Selecting on any of the 5 Network Settings will load an on-screen numeric keypad where the IP address details can be entered manually. Use adequate help for lifting. The correct calibration temperature is the average of several readings taken over a period of 20 minutes after the warmer has been pre-heated. To, IKEA PS Cabinet Instructions WARNING! This section outlines how to safely stack the holding unit.Step 1 Remove the base pan from the unit that will be on top. The Duke broiler consistently delivers juicier, more flavorful product leading to higher guest satisfaction. This equipment should be serviced by qualified personnel only. Proper planning and placement of the broiler will give you the best results in terms of long-term user convenience and satisfactory performance. Looking for more info about our models and technology? DO NOT PLACE HOLDING UNIT STACKS ON SURFACES THAT MAY EASILY TIP OVER. The specified capacity and opening is required in a dedicated hood for this appliance or in addition to other appliance vented through a common canopy exhaust hood. Duke Manufacturing is an agile, flexible organization that develops its strategic plan based on the voice of the customer. For the users Account an offline recipe set will always be available to the user. The warmer cavity should be cleaned and empty before the temperature is checked. This allows casters to touch the pallet. Instead, a list of available configurations will be available for programming.NOTE:H1 Bottom Heat Only Unit ConfigurationsH2 Top and Bottom Heat Unit ConfigurationsYou must select the proper configuration for your unit.These include: When a selected PHU configuration is selected the appropriate programming grid will appear. THIS MANUAL MUST BE RETAINED FOR FUTURE REFERENCE. 0000003530 00000 n The actual temperature read from the RFHU for both the top and bottom heaters will also appear. The information in this section is intended for the use of qualified operating personnel. Install the unit on the level countertop surface. We use state of the art CNC machines in manufacturing cells to match our customers Takt rates, We use data driven Six-Sigma tools to ensure a robust process which results in zero defects, Duke Manufacturing uses manufacturing cells with 1 piece flow, Control Plans, PFMEAs, SPC ran by certified operators. National Electrical Code (ANSI/NFPA No. Patents 6175099, 6262394 Other U.S. and Foreign Patents Pending IMPORTANT INFORMATION READ BEFORE USE PLEASE SAVE THESE INSTRUCTIONS 157751F FWM34 -22 FWM34-23 FWM34-24 The carrier must be notified within fifteen (15) days of the delivery of the broiler and the carton, skid and all packaging materials must be retained for inspection. THESE CAN DAMAGE THE STAINLESS STEEL AND PLASTIC SURFACES. Remove all materials from the unit interior.

Agility Ladder Benefits, Helikon Patriot Fleece Coyote, Articles D